Touchmark Corporate Office

March 6, 2026

Laboratory casework for an ASU research facility in Tempe required durable, chemical-resistant construction throughout. Castaldi produced custom phenolic resin countertops, epoxy-painted steel-base cabinets, and wall-mounted upper cabinets with adjustable shelving. All casework met university lab safety standards and was commissioned ahead of the semester start date.

Read More

WillScot Mobile Mini HQ

March 6, 2026

Multiple break room buildouts across a 180,000 SF technology campus in Tempe. Castaldi fabricated custom laminate cabinetry, integrated appliance panels, and solid-surface countertops for six separate break rooms with consistent finishes throughout. The project was completed floor-by-floor to coordinate with the phased occupancy plan.

Read More

D.R. Horton Corporate Office

March 6, 2026

A high-end tenant improvement for a Scottsdale financial services firm required custom executive office built-ins, a feature reception desk in book-matched veneer, and a full conference room millwork package including credenzas and wall panels. Castaldi worked directly with the interior design team to execute architectural details from concept through final install.

Read More

Dutch Bros HQ

March 6, 2026

Castaldi delivered a complete millwork package for the Dutch Bros Coffee corporate headquarters tenant improvement in Scottsdale. Scope included a custom reception desk, 200+ linear feet of open-office storage and shelving, a custom executive conference room wall panel system, and break room cabinetry. The design-forward aesthetic required precision color matching and seamless panel reveals throughout.

Read More

AKDHC Kidney Dialysis Center

March 6, 2026

A full clinic renovation at HonorHealth Scottsdale required custom medical casework in 14 exam rooms, a central nurse station, and a staff break room. Castaldi coordinated with the GC on a phased installation schedule to keep portions of the clinic operational during construction. Melamine and laminate finishes were matched to the owner’s brand standards throughout.

Read More

Phoenix Children’s Hospital

March 6, 2026

Three custom nurse station installations across two floors of a Phoenix Children’s Hospital expansion. Castaldi produced durable high-pressure laminate casework with integrated wire management, custom corner workstations, and patient-facing transaction counters built for high-traffic 24/7 use. Delivered on a fast-track schedule to meet the hospital’s opening date.

Read More

Banner Health East Mesa

March 6, 2026

Castaldi Custom fabricated and installed a complete casework package for a Banner Health medical office clinic in Phoenix. Scope included 85 linear feet of custom laminate base and upper cabinets, ADA-compliant exam room casework, and integrated solid-surface countertops throughout. All components were built to OSHPD-equivalent standards and coordinated with the GC’s MEP subs for a […]

Read More